Iron Rock Off Road - Grand Cherokee WJ 4\" Critical Path Long Arm Lift $1349.99
When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
Iron Rock Off Road - Grand Cherokee WJ 4\" Critical Path Long Arm Lift $1349.99:
$1349.99
How do you ride? Want the most your WJ can offer with the best budget long arm kit on the market? You can have it all with our Critical Path Long Arm Kit! You will not believe the performance gains for yourself until you get on your favorite trail where you didn\'t have the traction available to get through. Push your WJ further than it has ever gone before as your suspension melts to the trail! Yes, your WJ can become a very, VERY capable trail rig with this kit. Your family wants to go with you? Perfect! Your highway ride will be a dream come true with this kit. The long front control arms keep the suspension geometry much closer to stock for an impressively smooth ride at 4 inches of lift. We use an exclusive, non-binding, 3 link setup that has a pair of front long arms that will flex more than you thought possible. The bushings at the unibody are greasable and pivot to allow as much suspension travel as the long arms will allow. Iron Rock Off Road knows your WJ is an investment so we designedour kit with that in mind. What this means is, as always,this kit is 100% bolt on! NO WELDING OR CUTTING and only minor drilling is required for installation. No adjustment is necessary in any partexcept for our unique caster adjustment bracket that allows 5 degrees of adjustability, giving you the easiest installation of any long arm kit available!All you have to do is center the steering wheel after installation.If that\'s not enough, you don\'t even have to remove your front lower control arm mounts from the unibody!That means you can always return your WJ to stock form (notthat you would ever want to!)The question that has you all wondering right now is, \"Whydid they make a front only long arm kit for a WJ?\" The answer is we did it for several reasons.
- We wanted to offer a long arm kit to the public that couldbe affordable and appealing to the growing group of offroad enthusiasts wheeling their WJ\'s.
- Our testshave shown dramatically increased wheeling prowess with this kit installed, even without a rear long arm. The XJcrowd has known for a long time that \"front only\" long armkits allow them traction that would never be possibleotherwise.....and that\'s with leaf springs in the rear!
- Jeep did a great job designing your WJ\'s rear suspension.There is little to no natural binding with the A-Arm setupyou have. This means exceptional rear suspension travelwithout the long arm.
Kit Includes:
- Set of 4 new coil springs (4\" Lift)
- Set of 4 new premium hydro shocks
- Set of 4 new extended sway bar links (2 front, 2 rear)
- Heavy duty track bar
- A-arm spacer
- Complete front long arm package (passenger long arm and driver Iron-Y)
- Heavy duty front long arm brackets
- Transfer case drop kit
- Coil spring retainers
- Front brake line spacers
- Caster adjuster bracket
- All necessary hardware
- Detailed Installation Instructions
*requires modification of your stock lower control arm frame mounts
Iron Rock Off Road\'s satisfaction guarantee:
Our policy is simple, if there is something about your purchase you don\'t like, we\'ll make it right. If we can\'t make you happy you can return your product within 45 days. Items in 100% new condition will be entitled to 100% refund excluding shipping and handling. Installed/used/damaged (including damage in transit) parts will be entitled to a refund prorated from new retail value depending on condition. In no instance will Iron Rock Off Road be responsible for installation/labor on any satisfaction guarantee or warranty claim. Custom parts are non-returnable, non-refundable. A copy of your invoice is required for all warranty or satisfaction guarantee claims. Iron Rock Off Road\'s Warranty:
All products manufactured by Iron Rock Off Road, Inc. are guaranteed to be free of defects in materials and workmanship for as long as you own the product. If your product ever fails due to a defect in materials or workmanship we will replace it free of charge, excluding shipping and handling. This warranty does not apply to corrosion, finish, or normal wear. This warranty is non-transferable. Misuse, modification in any way, or any use other than the product’s designed purpose will void the warranty. Iron Rock Off Road control arms come with a lifetime unbendable guarantee. If you bend or break a control arm on or off road, we will replace it. Products not manufactured by Iron Rock Off Road, Inc. will be subject to the product manufacturer\'s warranty. Claims must be made to that manufacturer. Custom parts are non-returnable, non-refundable. Iron Rock Off Road shall not be liable for any incidental or consequential damages including without limitation, indirect or special damages as a result of product defects. This Limited Warranty does not cover miscellaneous expenses including labor costs for removal and installation of a defective part, materials, lost time or wages, rental vehicle, towing, lift, dock or storage fees. A copy of your invoice is required for all warranty or satisfaction guarantee claims
Froo | Froo Cross Sell, Free Cross Sell, Cross promote, Marketing, listing Apps, Apps, Application